Actually, I did upgrade the cpu and memory over the 3 years. I started off with 1GB of memory and went to 2GB. The CPU was a 3500+ and now it is currently a X2 4800+. I plan to sell the 4800+ and the memory.
Most of it is still in the mail.
Old(and current) system:
Lian-Li Chassis
Enermax 425W PS
Asus A8V(worst motherboard I've ever owned)
X2 4800+
2GB Mushkin DDR
Asus X800XT PE
2 -Plextor DVD-RW (one ide and one sata)
2 - WD 74GB Raptors
Floppy
Ordered:
CM Stacker Chassis
Tt Toughpower 1200W(I know, overkill, but I plan to upgrade to quad core and dual vids next year)
Asus P5K
2x1GB Mushkin DDR2 PC8000 - 4-5-4-12
Intel Core 2 Duo E6600
Asus 8800GTS 640MB
Thermalright Ultra-120 Extreme
Scythe S-Flex 120MM fan
I bought the Mobo and PS from Fry's today. The PS was actually $30 cheaper than Newegg which confirms my suspicions that Newegg has been doing a lot of price gouging lately. The mobo isn't supposed to be released until June 4th, so I was surprised to see it. From everything I've seen, it is a killer overclocker. I hope to get 450-500+MHz FSB and 3.2 - 3.6GHz on the CPU.
Most of it is still in the mail.
Old(and current) system:
Lian-Li Chassis
Enermax 425W PS
Asus A8V(worst motherboard I've ever owned)
X2 4800+
2GB Mushkin DDR
Asus X800XT PE
2 -Plextor DVD-RW (one ide and one sata)
2 - WD 74GB Raptors
Floppy
Ordered:
CM Stacker Chassis
Tt Toughpower 1200W(I know, overkill, but I plan to upgrade to quad core and dual vids next year)
Asus P5K
2x1GB Mushkin DDR2 PC8000 - 4-5-4-12
Intel Core 2 Duo E6600
Asus 8800GTS 640MB
Thermalright Ultra-120 Extreme
Scythe S-Flex 120MM fan
I bought the Mobo and PS from Fry's today. The PS was actually $30 cheaper than Newegg which confirms my suspicions that Newegg has been doing a lot of price gouging lately. The mobo isn't supposed to be released until June 4th, so I was surprised to see it. From everything I've seen, it is a killer overclocker. I hope to get 450-500+MHz FSB and 3.2 - 3.6GHz on the CPU.

Tomorrow, everything will come in except for the memory and fan. The fan might not make it until next week which means no new computer until next week. I haven't received tracking info on the memory yet, time to call Mushkin
Comment