It has been a bit quiet regarding my renovations, so time for an update...
So still quite a list of work, but the end is in sight!
- Kitchen floor is in place, walls are finished, and everything is measured - furniture expected in 3 weeks
- Bathroom walls and floors are almost finished, installation of showercabine and toilet is pending - should be completed this week. We have to wait for the washbasin, as the size for the cabinet in which it will fit has to be determined first (once toilet and bathtub are in place).
- Corridor floor is being put, walls need to get a last coat of paint - floors expected early next week, walls shortly after
- Walls in the rooms need to be smoothed, and painted. We had to wait for some input regarding a construction needed to hide pipes for an airconditioning unit, but now all that has been settled. The previous guys did a horrible job with the sockets, so most of them have to be removed and refitted. So now work in the rooms can start, while a lot of work, I think it could go quite fast (they are with 4 people).
- Last step is installation of the airconditioning, which will require the removal of some panels in the loggia.
So still quite a list of work, but the end is in sight!
Comment