Still tracking Feb 23
This wet dress rehearsal + static fire tests the entire system right up to the point of release, which is locked out.
The fixed service structure (FSS) tower is getting upgraded anti-corrosion coatings and metal cladding to minimize maintenance. Stripped out all the old Shuttle equipment, they did.
This wet dress rehearsal + static fire tests the entire system right up to the point of release, which is locked out.
The fixed service structure (FSS) tower is getting upgraded anti-corrosion coatings and metal cladding to minimize maintenance. Stripped out all the old Shuttle equipment, they did.
Comment