Long story short: still not finished...
Kitchen was installed, but the wrong top was put. The carpenter also was not happy with the lacquer, so he decided to take it all apart and have it redone. This caused a 2 week delay (but I was on holiday), but now the kitchen is finished. Some minor details, but nothing too bad.
In the bathroom, the showercabine has been refitted (it was not properly installed), and the bathroom furniture is nearly finished. Only thing missing is the blat for the washbassin. Which of course was the wrong one. They hung a cabinet far too high, due to which I have now two visible holes in my tiles. Plan is to have the tiles replaced.
The electrical company has not yet installed my new meter, as they forgot to send me the contract. There is more delay, as the electrician who will do it has not submitted some forms yet.
My own electrician has to return also, as I have no electricity in two sockets in the kitchen. Most likely it is a minor problem...
The shower tap is not working smoothly, but it should be replaced under warranty (on site warranty). I'll call them when I live there.
Plan is to move once the bathroom furniture is finished (all my stuff has been put back). The carpenter is on holiday, and in September I have a family visit, but after that I expect to finally move in.
After I move in, I will have the domotica system reprogrammed to include the airconditioning and to properly define all the switches. And that should be the end of it.
Kitchen was installed, but the wrong top was put. The carpenter also was not happy with the lacquer, so he decided to take it all apart and have it redone. This caused a 2 week delay (but I was on holiday), but now the kitchen is finished. Some minor details, but nothing too bad.
In the bathroom, the showercabine has been refitted (it was not properly installed), and the bathroom furniture is nearly finished. Only thing missing is the blat for the washbassin. Which of course was the wrong one. They hung a cabinet far too high, due to which I have now two visible holes in my tiles. Plan is to have the tiles replaced.
The electrical company has not yet installed my new meter, as they forgot to send me the contract. There is more delay, as the electrician who will do it has not submitted some forms yet.
My own electrician has to return also, as I have no electricity in two sockets in the kitchen. Most likely it is a minor problem...
The shower tap is not working smoothly, but it should be replaced under warranty (on site warranty). I'll call them when I live there.
Plan is to move once the bathroom furniture is finished (all my stuff has been put back). The carpenter is on holiday, and in September I have a family visit, but after that I expect to finally move in.
After I move in, I will have the domotica system reprogrammed to include the airconditioning and to properly define all the switches. And that should be the end of it.